Dimensions in the construction industry
A dimension is a derived unit used to measure a physical quantity such as length, width, height, distance, area, volume, mass and time.
Some of these units, such as area, can be obtained by the multiplication of two other dimensions, so for example (a x b) gives the area ab. Other measurements such as volume can be established by combining three linear measurements. The volume of say, a cylinder may be given by multiplying the area by the height (a x b x h).
A straight line has one dimension; an area has two dimensions and a volume has three.
Measuring velocity requires combining dimensions of length and time. Measuring force also requires combining various dimensions.
In construction, the dimensions most used are those concerning length to provide other dimensions of height, distance, area and volume. Measuring time is also important in construction, as is mass.
Dimensions are critical for co-ordinating building components and ensuring each fits correctly in its allocated place in a construction. Dimensionally co-ordinated products allow designers to select items which they can be confident will fit together (co-ordinate) dimensionally with the structure and other components to accepted tolerances.
Measurements are often included on drawings to give an overall understanding of size, or by wave of instruction to help workers setting out a project or manufacturing components.
The Geospatial Glossary, published by the Geospatial Commission, and accessed on 17 September 2022, defines the dimension of a mathematical space (or object) as: ‘…the minimum number of coordinates needed to specify any point within it.’ eg 1D, 2D, 3D etc.
[edit] Related articles on Designing Buildings
- Conversion of material volumes.
- Cubic metre.
- Floor area ratio.
- Gross external area.
- Gross internal area.
- How to take off construction works.
- International Property Measurement Standards.
- Land.
- Measurement.
- Measurement of existing buildings.
- Metric system.
- Net internal area.
- Place.
- Region.
- Space.
- Types of land.
- Units.
- Volume.
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.